Gold Member Since 2006
Audited Supplier
Chongqing Clipper Industry Co., Ltd.

Consruction Mechinery, Passenger Hoist, Mast Section manufacturer / supplier in China, offering Building Motor Lifting Electric Hoist Mast Section, Cable Pulley for Construction Hoist Spare Parts, Custom Small Metal/ Steel Worm Gear and so on.

(/ )

Supplier Homepage Product Construction hoist spare parts Building Motor Lifting Electric Hoist Mast Section

Building Motor Lifting Electric Hoist Mast Section

FOB Price: US $1-200 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $1-200/ Piece
Get Latest Price
Port: Shanghai, China
Production Capacity: 1000sets/Month
Payment Terms: L/C, T/T, D/P, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Type: Construction Hoist
  • Certification: CE, ISO9001: 2000
  • Color: Other
  • Transport Package: Wooden Case
  • Application: Hoisting Machinery
  • Condition: New
  • Trademark: CPTC
  • Origin: China
Product Description
Specification
- Construction Hoist Spare Parts; 
- YONGMAO, ZOOMLION, GJJ, SHENYANG, SCM, CPTC.
High quality hoist parts 
Fast delivery 
Good price
OUR FEATURES
High quality hoist parts 
Fast delivery 
Good price 
GJJ Roller
The main chord of the mast use Φ76*6,Q345B material, high frequency welded pipe which has high strength, good wear resistance and high linear.The level support of the mast use Q345B steel plate stamping & bending process, so that the rack bearing is more strength, and the straightness is better, and also the performance and service life is better.Mast section three type:650×650mm,800×800mm and 650×900mm,

Company Information

CPTC:
We are the professional mark and seller of spare parts including gears,driving device,gearracks,motor,gearbox, coupling, safety device. etc;electric products such as limit switch,overload sensor and indicator for hoist, tower crane, hoist and so on.
By our professional technology and engineer,we choose, design and mark the suitble parts for your construction machines with high quality.


Building Motor Lifting Electric Hoist Mast Section

Building Motor Lifting Electric Hoist Mast Section

Packaging&Shipping

Packaging Details:Wooden cases

Delivery Detail:1-20 Days
Building Motor Lifting Electric Hoist Mast Section

FAQ:

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

 A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, please feel free to contact us as below
Building Motor Lifting Electric Hoist Mast Section

Send your message to this supplier
Avatar
Mr. Chen
*From:
To: Mr. Chen
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now